1. Tenant
shall have to have their electrical, communications and HVAC systems
designed by a professional PEC licensed consulting firm.
2.
Detailed designs layouts (with engineering calculations) of
electrical & mechanical systems shall be submitted for approval to
PNSC before interior works are commenced. PNSC shall get thru
designs reviewed by their consultants for which the tenant shall be
required to pay Rs.100,000/= per half floor (in 2008).
3. Proper
safety and house-keeping procedures (temporary electricity
distribution, etc) shall have to be observed during construction.
See Annexure-A.
4.
Electrical works shall be carried out by a licensed electrical
contractor in compliance with IEE/UK Wiring Regulations, (BS 7671)
using good quality materials (cables, circuit-breakers, switches,
sockets, light-fixtures, DB’s etc).
5. The
completed installation shall be got inspected and approved by the
local electrical inspector.
6. The
overall design is based on a half-floor population of 75 persons
maximum. |
|
B- Electrical Systems |
|
1. Power
Provisions by PNSC
a) 55kW, “160A TP MCCB” as a load tap off box for full floor.
b) 30kW, “100A TP MCCB” as a load tap off box for half floor.
-
The power shall be
available as a TP MCCB installed within rented premising.
-
The meter
installed in electrical closet shall be a digital
energy-analyzer with central energy recording facility at
PNSC offices.
-
Additional power
tap offs shall be available on additional payment.
Work by Tenants
-
All switchgear,
cabling, wiring, sockets, outlets lights within rental
space.
-
All final circuits
shall be protected by 300/500mA RCDs for fire-protection.
-
Approved
manufacturers are as follows:
| Light fixtures: |
Philips, Thermec, Cooper (ESW). |
| Cables: |
Pakistan Cable
Pioneer Cable
Newage Cable |
| Switchgear: |
Libra
Sunbeam
Hussain & Company
Babar Brothers
Siemens
Areva |
| |
|
back to top
2. Standby Power
Provisions by PNSC
-
The above KESC power shall be fully backed up by a set of
standby generators owned & operated on a 24/7 basis by PNSC.
No separate cabling/changeover systems are required.
-
Tenants are not allowed to install any private gensets.
back to top
3. Fire Alarm
Provisions by PNSC
-
An
analogue addressable fire alarm system shall be installed
with a smoke-detectors, manual call-stations and sounders in
interior spaces (as schematically shown. in Annexure-1).
Additional smoke detectors as required by tenants, shall
also be supplied & installed by PNSC on additional payment.
-
Tenants are not allowed to make any modifications to
fire-alarm devices/wiring.
Work by Tenants
If the
tenant requires local (monitoring only) at his floor, this can
be made available at extra cost of remote annunciation control
panel/wiring.
back to top
4. Communications
4.1 Voice
Provisions by PNSC
-
2
x 25 pair for full floor.
-
1
x 25 pair for half floor.
Work by Tenants
-
PTCL connections, junction boxes, cabling outlets, PABX,
etc.
back to top
4.2 Data
Provisions by PNSC
-
A
6-core single mode fibre optic cable backbone shall be
available for each half floor tenant from ground level
(patch panel). The service provider shall only have to
connect his cable at ground floor.
-
A
shielded category 6, 4-pair cable and an RG6 coaxial cable
shall be available.
-
A
tower shall be available at roof tenant’s antenna/dishes.
Work by Tenants
-
All fibre / copper cabling, patch panels, outlets, within
their rented space.
-
Additional space for dishes, antennas on roof can be
made available (if space is available) at additional cost.
back to top
5. Earthing & Bonding
Provisions by PNSC
Work by Tenants
back to top
6. Voice Evacuation System
Provisions by PNSC
Work by Tenants
|
|
C-
Mechanical Systems |
|
back to top
1.
Air-Conditioning System
Provisions by PNSC
-
Two floors mounted chilled water air handling units (AHU’s),
each suitable for one-half floor shall be installed in the
core area, as per the attached Annexure-2. These AHU’s shall
be made fully operational.
-
The AHU’s are provided treated fresh air @ 2500 cfm per
floor.
-
Sound attenuators are installed in the AHU’s supply and
return duct terminating at edge of tenant floor. Further
extension by tenants.
-
Air conditioning will be available after office hours, and
will be metered for charging at mutually agreed rates.
-
Toilets are provided with a central extract system.
-
Tenants shall be provided the control of switching ON & OFF
the AHU & temperature control to allow them to practice any
energy saving regime, & thereby save operating cost of
air-conditioning.
Work by Tenants
-
Extension of supply and return air duct to suit tenant’s
interior design.
-
Due to one AHU per half floor and for proper control of
temperature in separate rooms VAV (Variable Air Volume)
system is recommended.
back to top
2. Server Rooms
& other 24-hours Air Conditioning
Provisions by PNSC
-
A
cooling water loop is installed in the building, which is
connected to the cooling tower and will run round the clock,
24 hrs X 365 days.
-
This cooling water loop can be used by tenants to install
water cooled air-conditioners for their round the clock
equipment, such as server rooms, etc. A 2” dia metered
connection shall be provided to the tenant at the location
shown on drawings. All work beyond this 2inch dia connection
shall be done by the tenant.
-
A
fixed monthly charge shall be paid by the tenant for the use
of this facility, based on the quantum used.
-
Drain point for use of water cooled air-conditioners shall
be provided at the location shown.
Work by tenants
back to top
3. Fire Fighting
Provisions by PNSC
-
A
complete automatic wet-riser system will be installed, with
UL listed & FM approved fire pump set consisting fan
electric motor driven pump, & diesel engine driven pump &
jockey pump sized for 750 US gpm.
-
The complete building will have automatic fire sprinklers.
-
For fire sprinklers a floor isolation valve assembly and
cross-main with tees for branches will be installed, as per
the attached Annexure-3
-
Staircase landings shall be provided with 2 ½” dia hydrants
for use by fire fighters & dia 1” x 100ft hose reel for
emergency fire fighting by building occupants.
Work by tenants
-
Tenants will install all branch piping and fire sprinklers
to suit their interior design. All work will be done in
accordance with NFPA-13 & other relevant NFPA standards.
-
Tenants will install adequate quantity of portable fire
extinguishers.
-
Tenants will install the own special fire protection system,
such as gaseous based extinguishment system for special
needs, such as sever rooms.
back to top
4. Life safety systems
-
Provisions by PNSC
A smoke extract system will be installed, which will be
actuated if smoke alarm is received from the fire alarm
system. These will cause smoke extract fans, located on the
roof to be actuated & dampers on the fire floors to open,
while dampers on the other floors remain closed. This
negative pressurization will case smoke to be restricted to
& be extracted from the fire floor, thus keeping the egress
ways clear for exit of building occupants.
-
Simultaneously stairwell pressurization fans will be
operated to positively pressurize the staircases & thus keep
the smoke from entering the stair well, & allowing egress of
the building occupants.
Work by tenants
back to top
5. Plumbing of Toilets and Pantries
Provisions by PNSC
-
Toilets and pantries on each floor are being provided in the
core area as shown in the typical floor layout.
-
PNSC will carry out complete plumbing works for these
toilets & these will be handed over in operational state.
Work by tenants
-
Changes in the toilet and pantry can be made at the cost of
the tenant, after due approval by PNSC
-
No
gas will be made available for cooling or heating of food.
Tenants will make their own provisions of cooling / heating
equipment which shall be electric operated.
For enquiry please contact:
Afzal
Saeed Khan, Manager (Estate)
Pakistan National Shipping Corporation PNSC Building.
Phone
No. 9204024
Cell
No. 0302-8290309
Email: